T&N Gilmartin recently installed new footpaths at Riverside Park Glenrothes using an innovative product by Tarmac called ULTITREC. It is a “recycled footpath material produced from selected arisings from highway and maintenance works.
Using this product eliminates the need for mining raw materials reducing the project’s overall carbon footprint. ULTITREC is a 100% recycled pathway material that provides a more sustainable approach to footpaths and cycle tracks. Made from selected waste products from highway reconstruction and maintenance works, ULTITREC provides an inexpensive but durable footpath surfacing, especially in rural locations”.